Wednesday, October 7, 2026

Back to today

From X

@StableBread

Fajasy on X

McCreedy West had “a few weeks” of development (the tunnels that reach new ore) ahead of its miners and no stopes (the blocks of ore being mined) ready to go when Magna Mining $MGMNF (TSX: $NICU) took it over in March 2025. So Magna spent 2025 catching up and missed its H2 2025 grade guidance, shipping ore at 2.64% copper equivalent (CuEq, which converts every metal into copper at set prices) in Q3 and 3.41% in Q4, below the 2.9-3.4% and 3.8-4.4% it guided. 2026 has gone better. In Q2, McCreedy West set Magna-era records for tonnage (98,446 tons) and cash margin, and production costs fell to US$144/ton processed from US$156 in Q1. Through H1 2026, McCreedy West produced 8.62M payable pounds of CuEq (the metal the mill and smelter pay for after recoveries). It needs 7.4-9.4M lbs in H2 to land in the 16-18M lbs guidance range, so repeating H1 would put the year inside guidance. Costs are inside guidance too. H1 cash costs (operating costs plus smelting and refining charges, per payable pound) of US$3.63/lb sit within the US$3.40-3.80 range. All-in sustaining costs (AISC, which add sustaining capital and corporate overhead) of US$4.39/lb also sit within US$4.20-4.70. Both exclude the precious metals stream held by Franco-Nevada $FNV, which buys half the mine’s gold, platinum, and palladium at a discount. Magna says the stream adds US$0.78-0.92/lb at its 2026 budget prices. Magna’s first reserve estimate for McCreedy West, effective December 31, 2025, came to 987,000 tonnes of probable reserves, which Magna says supports three years of production at its 2026 mining rate. Three years sounds short, but CEO Jason Jessup says it’s “in line with the reserves that McCreedy West has operated with since being restarted in 2003 by FNX Mining,” and that Magna “could have extended” the reserves. McCreedy West’s Intermain nickel zone isn’t in the reserves or the guidance. Jessup wants nickel to hold “north of $8” per pound “for at least a quarter” before restarting it, and says Magna could be shipping Intermain nickel to Vale $VALE “within 8 to 12 weeks” of a decision. At ~$7.48/lb nickel, the Intermain restart waits.

Research Roundup Vol. LV

OpenAI’s enterprise privacy push and Synopsys’s Factory 2 royalty model anchor a technology roundup, alongside oil above $100 and Bitcoin’s…

New Position (ONON): Game is On

On Holding (ONON) is gaining sportswear share, expanding store space and launching soccer with Kylian Mbappé as investors debate U.S.

When the Ads Come to the Data

Meta’s Muse could place ads inside its AI agent by letting a private VM select offers from advertisers without sharing user data with…

VEEV · long

Veeva Systems INC

Veeva Systems is a vertical software company valued as if its best growth years are behind it.

Deep Dive: Intuit ($INTU)

Intuit’s $21.4 billion software franchise faces AI-driven pricing pressure in tax and accounting, even as QuickBooks and TurboTax retain…

Canterra Minerals: Research Note

Canterra Minerals increased Lundberg indicated tonnage 55% to 26.1Mt, with 226.2Kt of contained copper equivalent, supporting a Buchans…

Kenorland Minerals: Research Flash

Franco-Nevada bought 10.0 million Kenorland shares, a 12.4% stake, for C$22.2 million in a secondary transaction that issued no new shares.

Publications we follow

Every publication on this site, hand-picked.

109 publications

Newsletters 92

X accounts we follow

Every account on this site, hand-picked.

74 accounts

Investor letters we follow

189 firms

Sectors

Ordered by how often our editor reaches for them.