New Ask Claude or ChatGPT about any stock, using Bullpen. Bullpen in Claude or ChatGPT. 7 days free

Friday, November 20, 2026

Back to the front page

From X

Fajasy on X

In August, I noted that the design in the PEA (the first-pass study) for American West Metals’ $AWMLF Storm copper project meant no tailings dam and no process chemicals. In the PFS (the more detailed study that replaced it), initial capex came in at US$81.0M, 70.9% above the PEA’s US$47.4M, and pre-development capex rose to US$27.3M from US$14.7M. So Storm needs US$108.3M before first copper, up 74.4% from US$62.1M, plus US$10.2M of expansion capex later (US$118.5M over the mine life). Processing drove most of the increase, at US$38.0M of initial capex against US$9.4M in the PEA. Test work showed that crushing broke the ore along grain boundaries and pushed more copper into the fines that bypass the ore sorters (machines that pick copper-bearing rock out of the waste). So the plant now adds a small flotation circuit (which uses chemical reagents to float copper minerals off finely ground ore) and a US$4.2M tailings facility, both of which the PEA’s design of ore sorters and gravity separators avoided. The PFS adds flotation reagents and filtered tailings, which get stacked dry. Storm’s footprint is still small next to a conventional flotation mill’s, but regulators now have reagents and tailings to review. With the flotation circuit, the plant recovers 68% of the copper in the ore, or 103,000t over the mine life, up from ~61% (~83,000t from 10.3Mt @ 1.32% copper) in the PEA plan. But the product grades 15% copper, down from the PEA’s 17.1%, so Storm has to bag and ship 41.3% more of it (688,000t vs. 487,000t) during the 5-6 weeks each summer when ships can reach the site. Over the copper the plant recovers, operating costs come to ~US$3.17/lb vs. ~US$2.66/lb in the PEA (total operating costs over recovered pounds, before silver credits), or 19.4% more per pound. So the PFS mine recovers 23.8% more copper than the PEA’s, but each pound costs 19.4% more to produce, and the processing plant costs four times as much to build, since the fines now need their own flotation circuit and tailings facility.

Google

Google has narrowed OpenAI’s chatbot lead through Gemini distribution across Search, Android and Chrome, backing its AI stack with custom…

Key Man Risk

Meta and Nvidia show how founder-led strategy makes key-man risk central to long-term AI and Reality Labs spending.

Problems at AMD (AMD)

AMD has committed up to $161.1 billion in customer equity rights and $33.1 billion in guarantees, leases and investments, while holding…

Publications we follow

Every publication on this site, hand-picked.

130 publications

Newsletters 110

Seeking Alpha 98 of 301

X accounts we follow

Every account on this site, hand-picked.

94 accounts

Investor letters we follow

383 firms

Sectors

Ordered by how often our editor reaches for them.