New Ask Claude or ChatGPT about any stock, using Bullpen. Bullpen in Claude or ChatGPT. 7 days free

Saturday, November 28, 2026

Back to the front page

Bumpy Road

Berkshire Hathaway built a 12% Lennar stake as the homebuilder cut margins to preserve volume, then stopped buying after a short seller’s property-deed report.

From X

Convequity on X

$ORCL Spends More of Its Cash Flow on Capex Than $AMZN or $MSFT — Does the Backlog Justify the Stretch? We hold Oracle, so we pulled the numbers from our ABBX dashboard to check whether the contracted backlog supports the heavier spending. Capex intensity (last four quarters) Oracle spent about 161% of operating cash flow on capex (to 31 Aug 2026). Amazon was about 107% and Microsoft about 63% (both to 30 Jun 2026). Oracle put USD 75.7B into capex against USD 46.9B of operating cash flow. Debt and lease load Add borrowings, lease liabilities, and the undiscounted value of leases signed but not yet started. Purchase obligations are excluded for all three. - Oracle: about USD 457B, or 3.6x its USD 125B of borrowings. - Amazon: about 2.9x. - Microsoft: about 11x (its borrowings are small relative to lease commitments). Oracle stands out on size versus cash flow: roughly 9.7x trailing operating cash flow, versus 2.5x at Microsoft and 2.3x at Amazon. The backlog counterweight Oracle’s RPO (remaining performance obligations) is USD 664B — close to Microsoft’s USD 678B commercial RPO, while generating only about a quarter of Microsoft’s operating cash flow. RPO covers about 1.45x Oracle’s debt-plus-leases figure, versus 1.48x at Microsoft. Those contracts provide revenue visibility, though delivery still depends on margins and timing. Amazon’s USD 496B backlog is AWS-only, so it is not a clean comparison. ABBX capacity estimates show Oracle rising from about 4 GW to about 12.8 GW by 2029, Microsoft from 8.5 to 17 GW by 2030, and Amazon from 10.6 to 16 GW by 2028. That implies roughly USD 52B of RPO per planned GW for Oracle versus about USD 40B for Microsoft (rough scale comparison given different RPO scopes and time horizons). Our take The bigger risks at Oracle are timing, execution, and funding rather than a lack of demand. Oracle expects about 13% of its RPO to convert to revenue in the next 12 months while capex is being spent now. Its 12.8 GW figure is an ABBX estimate, not company guidance; it carries ABBX’s lowest confidence of the three, and grid approval is still pending at one or more sites. Oracle also sold USD 20B of stock in FQ1 FY27. We think the backlog justifies holding the position, but sized for funding risk. What we watch: RPO converting to revenue on schedule, new capacity coming online, and whether more equity is needed.

Altria: Buying Imperial Brands?

Altria is weighing an all-cash bid for Imperial Brands, with Japan Tobacco reportedly targeting Imperial’s U.S. operations.

On The Radar #9

Belden’s $1.87 billion Ruckus acquisition lifted leverage near 4x as industrial networking, enterprise Wi-Fi and data-center demand drive…

TomorrowX | ARM Q&A

Arm executives discuss OpenAI, supply constraints, an IP-to-silicon shift, and CPU demand from AI workloads.

FELE · long

Franklin Electric CO INC

Franklin Electric (FELE) is positioned to compound per-share earnings at a low-double-digit rate, with growth optionality across several…

Shorting a Cannibal

Bill Ackman’s 20 million-share Herbalife short lost $1 billion as Carl Icahn accumulated a quarter of the company and threatened a squeeze.

Publications we follow

Every publication on this site, hand-picked.

130 publications

Newsletters 110

Seeking Alpha 110 of 314

X accounts we follow

Every account on this site, hand-picked.

94 accounts

Investor letters we follow

383 firms

Sectors

Ordered by how often our editor reaches for them.